
OFFICE OF THE MISSION DIRECTOR
NATIONAL HEALTH MISSION, ASSAM
Saikia Commercial Complex, Sri Nagar Path, Near Post office Bus Stand
G. S. Road, Christianbasti, Guwahati - 781005
Website : https://nhm.assam.gov.in E_mail ID : [email protected]
File No: NHM/PROC/IDSP/Equip-Inst/3739/2018-19/SPO-11199 |
Date: 01/01/2019 |
From:
J.V.N. Subramanyam, IAS
Mission Director
National Health Mission, Assam
To,
Alliance Scientific
H.No. 1, Natun Path, Hatigaon, Guwahati-781038
Subject:
Supply of Water Bath for District Public Health Laboratories under IDSP
Ref:
Your quotation against NHM, Assam Tender No.NHM/PROC/EQUIP-INST/3536/2017-18/41019 Date: 12/3/18
Sir,
You are requested to supply Water Bath for District Public Health Laboratories under IDSP as per terms & conditions below-
Item rates and details are at Annexure-A
FMR Code : 6.1.1.1.5a
ITEM DETAILS & PRICE:
Item Name |
Quantity |
Rate(Exclussive of GST) |
GST(%) |
Total Amount(Incl. GST) |
Delivery Destinations |
Water Bath ( ) |
3 |
16300.000 |
18 |
57,702.00 |
As per annexure B |
Grand Total |
57,702.00 |
|
Terms & Conditions of the Supply order is described below: -
- The above price is on FOR destination basis inclusive of all costs including transportation, transit insurance, loading & unloading and any other incidental charge.
- The total ordered quantity must be delivered at the Health Institutions as indicated at Annexure-‘B’ within 60 days from the date of issue of the purchase order.
- The supplied items shall be strictly in conformity with the specifications. If any of the items are found to be inferior or sub standard in quality the same must be replaced with acceptable quality at supplier’s cost within a period of two weeks from date of intimation. In case of failure to replace the defective goods on time or in the event the replaced goods are found inferior or substandard in quality, the supplier will be liable to be blacklisted.
- In case there is delay in delivery beyond the stipulated period as mentioned, there shall be reduction in price @0.5% of the value of delayed goods per week of delay or part thereof subject to a maximum of 10% of the total order value. Once the maximum price reduction is reached, the order will be terminated.
- Payment terms will be 100 % within 30 days from date of receipt and acceptance. Payment will be released on satisfactory completion of supply of entire ordered quantities.
- The supplier shall conduct demonstration after supply the items in the health institutions.
- All other Terms & Conditions as specified in the tender reference NHM/PROC/EQUIP-INST/3536/2017-18/41019 Date: 12/3/18 shall be applicable.
Encl. – 1) Details of items with delivery destination as per Annexure -’B'
Annexure A:
Sl |
Item Name |
Rate(Exclussive of GST) | GST(%) | Total quantity to be supplied |
Total Amount | Delivery Destinations' Districts |
1 |
Water Bath Make: Icon Instruments Co. Model: IIC-103A Warranty: 2 years |
16300.000 | 18 | 3 |
57702 |
1) |
DDWH, Baksa |
1 |
2) |
DDWH, Bongaigaon |
1 |
3) |
DDWH, Chirang |
1 |
|
|
(J.V.N. Subramanyam, IAS)
Mission Director
National Health Mission, Assam
|
Memo No: NHM/PROC/IDSP/Equip-Inst/3739/2018-19/SPO-11199 |
Date: 01/01/2019 |
Copy to:
1) PS to Honble Minister, H&FW Deptt. GoA for kind information
2) Principal Secretary, H&FW Deptt. GoA. for kind information
3) DC, Baksa, Bongaigaon, Chirang,
4) Jt. DHS, Baksa, Bongaigaon, Chirang,
5) The SPO, IDSP, NHM Assam
6) The District Epidemiologist, Baksa, Bongaigaon, Chirang
7) DPM/ DDSM, Baksa, Bongaigaon, Chirang,
8) The JE (Ins)Baksa, Bongaigaon, Chirang District. They should ensure receipt and installation of the items and forward to the office for release of payment to supplier (Certificate to the effect that the articles has been entered in to stock ledger on..................... At page no ..............dt............................) They are requested to receive and issue the materials online in the http:/nrhmassam.info portal.
9) M/s TBS India, they are requested to tag the bio medical equip/inst and upload in the dash board. Warranty management to be ensured.
|
Mission Director
National Health Mission, Assam |